Three Cost Factors in Cloud Datacenter
By -
5.3.11
0
Cloud datacenter doesn’t require experts to operate it, but it requires skilled people to see the maintenance, maintain the workloads and to keep the track of the traffic. The labor cost is 6% of the total cost to operate the cloud data center. Power distribution and cooling of the datacenter cost 20% of the total cost. Computing cost is at the end and is the highest as it is where lots of resources and installation has to be done. It costs the maximum left percentage.
Tags: